← Custodia
Definition

Conditional Status

Also known as: Conditional CMMC Status, Conditional Level 2 (Self)

Conditional status is a CMMC Level 2 result a contractor can achieve with a score of 88 or better out of 110 when the remaining gaps are all eligible for a Plan of Action and Milestones (POA&M). It lets a contractor be treated as compliant while it closes those items, which it must do within 180 days to convert to Final status.

In more detail

Under 32 CFR 170.21, a Level 2 assessment that is not perfect can still support award if the score is at least 88 and every open requirement is POA&M eligible. A short set of requirements can never be placed on a POA&M, and any requirement worth 5 points cannot be either, so those must be fully met regardless of score.

Conditional status is time-boxed. The POA&M items must close and be verified within 180 days, at which point the status becomes Final. Miss the window and the status lapses.

Primary source
32 CFR 170.21, POA&M and conditional status

Related terms

Stop reading. Start filing.

Find your SPRS score in 4 minutes. Then file it in 7 days.

Take the free SPRS quiz to see exactly where you stand on the 15 FAR 52.204-21 safeguarding requirements, no signup, no card. If you like what you see, the 7-day Custodia trial picks up where the quiz leaves off and walks you to a signed, bid-ready package.

7-day free trial · No credit card required · $249/mo Self Service ($2,496/yr on annual, two months free)