Example, read only. A sample company whose own team runs its CMMC program here, reviewed by a credentialed officer and kept current.

← All 110 requirements

Step 5 of 5 · The score

Your honest number

This is the score an assessor would compute from Meridian Defense Systems, Inc.'s own findings. It was not always 110: the self assessment recorded 106, 4 gaps rode a plan of action, and the team closed every one inside the 180 day window.

110 / 110
109 done · 0 still open · 1 don't apply
110 of 110. Final Level 2 path: no POA&M needed.

If you filed today: 110 of 110, the Final Level 2 (Self) path; every requirement MET or not applicable, no plan of action needed.

How it got here

Recorded Conditional at 106 on March 11, 2026; every item closed and posted July 22, 2026.

On the day of recording the findings read 105 done, 4 still open, 1 don't apply. A score of 106 meets the 88 minimum and every gap was POA&M eligible, so the Conditional path opened, with every item due to close by September 7, 2026 (32 CFR 170.21). The closeout self assessment recorded 110, which is Final Level 2 (Self). The three year clock still runs from the Conditional date.

The plan of action, closed out (4)

Each item carried a plan and a target date inside the 180 day window. None of them was one of the 6 requirements that can never ride a POA&M.

AC.L2-3.1.3 Control CUI Flow

1 ptClosed

A data loss prevention rule that blocks external sharing of files labeled CUI in the GCC High tenant.

Target date
June 30, 2026
Closed on
June 18, 2026

AT.L2-3.2.3 Insider Threat Awareness

1 ptClosed

Insider threat awareness added to the annual training, completed by everyone on the People roster.

Target date
May 29, 2026
Closed on
May 6, 2026

AU.L2-3.3.3 Event Review

1 ptClosed

A monthly audit log review, with the first two reviews recorded and dated.

Target date
July 31, 2026
Closed on
July 8, 2026

CM.L2-3.4.3 System Change Management

1 ptClosed

A change log register, with every change to the enclave approved before release.

Target date
June 15, 2026
Closed on
June 2, 2026

Next is attest and file: the readiness checks, the affirmation by Elena R. Marsh, and the SPRS record.

See the readiness and the record →How the team gathered the proof →

Self assessed and self attested: you score yourself in SPRS on a three year cycle and your senior official affirms it every year. As of September 3, 2026 a class deviation directs contracting officers to remove third party assessment from contracts. The program rule still provides for it, so your solicitation sets the track. Your team builds the same evidence either way.

Your team works all 110 requirements on the platform, a credentialed officer reviews every step, and the record stays true all three years. Start free for 30 days, no credit card, or book a free advisory call if you would rather talk it through first.